Scope of Work:
Fabricate and install the building, pipelines and parts of the dryer for the No. 3 Spray Dryer at Murray Goulburn. Pipelines included in this were chilled water, hot water, steam lines and air.
Fabricate and install the building, pipelines and parts of the dryer for the No. 3 Spray Dryer at Murray Goulburn. Pipelines included in this were chilled water, hot water, steam lines and air.
© 2024 Hulls Engineering Australia. All Rights Reserved